Luton Airport Rail Link

A 2000 Meter long mass transit passenger system will be erected between two purpose-built stations, starting from Stirling place, near Luton Airport Parkway Station, to the airport terminal.

The scheme is part of a huge £1.5bn investment program which outlines the 20-year plan to transform the town. The transit system is due to open in 2021.

Click on an advert below to apply for a role. Please call the consultants number on the advert for more information.